NCT02684006

A Study of Avelumab With Axitinib Versus Sunitinib In Advanced Renal Cell Cancer (JAVELIN Renal 101)

Pfizer · Phase 3 · COMPLETED

Enrollment
886
Study start
Mar 23, 2016
Primary completion
Aug 31, 2023
ACTUAL

Registered primary endpoints

Progression Free Survival (PFS) as Assessed by Blinded Independent Central Review (BICR) in Programmed Death-Ligand 1 (PD-L1) Positive Participants

PFS: time from the date of randomization to the date of the first documentation of progressive disease (PD) according to Response Evaluation Criteria in Solid Tumours (RECIST version \[v\] 1.1) or death due to any cause, whichever occurred first as assessed by BICR. PFS data was censored on date of last adequate tumor assessment for participants who did not have an event (PD or death), who started new anti-cancer therapy prior to an event or for participants with an event after 2 or more missing tumor assessments. PD was defined as at least a 20 percent (%), increase in the sum of all the longest diameter of target lesions, taking as reference the smallest sum on study (this includes the baseline sum if that is the smallest on study). In addition to relative increase of 20 %, sum must have also demonstrated an absolute more than (\>) of at least 5 millimeter (mm). The appearance of one or more new lesions was also considered progression.

Time frame: From date of randomization to the first documentation of PD or death due to any cause or censoring date, whichever occurred first (maximum up to approximately 26 months)

Overall Survival (OS) in PD-L1 Positive Participants

OS was defined as the time from the date of randomization to the date of death due to any cause. Participants last known to be alive were censored at date of last contact. Analysis was performed using Kaplan-Meier method.

Time frame: From the date of randomization to the date of death due to any cause or censoring date, whichever occurred first (maximum up to approximately 89 months)

Linked assets

Original registry record

ClinicalTrials.gov · NCT02684006

Registry last update: Jul 30, 2025 · Retrieved Nov 24, 2026

Estimated completion dates are not confirmed results disclosure dates.