NCT02873962

A Phase II Study Of Nivolumab/ Bevacizumab/Rucaparib

Dana-Farber Cancer Institute · Phase 2 · ACTIVE NOT RECRUITING

Enrollment
72
Study start
Nov 10, 2016
Primary completion
Feb 2025
ACTUAL

Registered primary endpoints

Cohort 1: Objective Response Rate

The objective response rate was determined by the frequency of patients who had objective tumor response, determined per Response Evaluation Criteria In Solid Tumors Criteria (RECIST v1.1) for target lesions and assessed by CT or MRI, where objective response represents either a confirmed complete response (CR; disappearance of all target lesions) or a confirmed partial response (PR; at least a 30% decrease in the sum of the longest diameter of target lesions, taking as reference the baseline sum diameters); objective response = CR + PR. The ORR is therefore reported as the percentage of participants who achieved a CR or PR per RECIST v1.1.

Time frame: 18 months

Cohort 2: Objective Response Rate

The objective response rate was determined by the frequency of patients who had objective tumor response, determined per Response Evaluation Criteria In Solid Tumors Criteria (RECIST v1.1) for target lesions and assessed by CT or MRI, where objective response represents either a confirmed complete response (CR; disappearance of all target lesions) or a confirmed partial response (PR; at least a 30% decrease in the sum of the longest diameter of target lesions, taking as reference the baseline sum diameters); objective response = CR + PR. The ORR is therefore reported as the percentage of participants who achieved a CR or PR per RECIST v1.1.

Time frame: 2 years

Cohort 3: Tolerability

Tolerability of the combination of nivolumab, bevacizumab, and rucaparib for cohort 3 was determined by the number of patients who maintained dosing without drug modifications (including dose holds and reductions) within the first 100 days of dosing.

Time frame: 100 days

Linked assets

Original registry record

ClinicalTrials.gov · NCT02873962

Registry last update: Apr 1, 2026 · Retrieved Nov 24, 2026

Estimated completion dates are not confirmed results disclosure dates.