NCT04620733

RESPONSE: Response to Seladelpar in Subjects With Primary Biliary Cholangitis (PBC) and an Inadequate Control to or an Intolerance to Ursodeoxycholic Acid (UDCA)

Gilead Sciences · Phase 3 · COMPLETED

Enrollment
193
Study start
Apr 21, 2021
Primary completion
Aug 11, 2023
ACTUAL

Registered primary endpoints

Percentage of Participants With Response Criteria for the Composite Endpoint of ALP <1.67 × Upper Limit of Normal (ULN), ≥15% Reduction in ALP, and Total Bilirubin ≤ 1.0× ULN at Month 12

Percentages were rounded-off.

Time frame: Month 12

Percentage of Participants With Treatment-emergent Adverse Events (TEAEs) and Serious TEAEs

Percentages were rounded-off.

Time frame: First dose date up to last dose plus 30 days (up to 13.4 months)

Percentage of Participants With Shift of ≥ 2 CTCAE Grades From Baseline in Treatment-emergent Laboratory Abnormalities Related to Hematology and Select Liver Biochemistry

Treatment-emergent graded laboratory abnormalities were defined as values that increase at least 2 toxicity grade from baseline at any time post baseline. The laboratory abnormalities were graded using National Cancer Institute Common Terminology Criteria for Adverse Events (NCI CTCAE), where Grade 1: mild, Grade 2: moderate, Grade 3: severe, Grade 4: potentially life-threatening laboratory abnormality. The data is reported for shift of ≥ 2 grades from baseline in values for hematology and select liver biochemistry. Hematology includes parameters like RBCs, (erythrocytes), hemoglobin, hematocrit, platelets, WBC, WBC differentials (absolute and percentage) including basophils, neutrophils, lymphocytes, eosinophils, and monocytes, etc. Biochemistry included select liver function tests like blood bilirubin, gamma-glutamyl transferase (GGT), aspartate aminotransferase (AST), alanine aminotransferase (ALT) and alkaline phosphatase. Percentages were rounded-off.

Time frame: First dose date up to last dose (up to 13.4 months)

Linked assets

Original registry record

ClinicalTrials.gov · NCT04620733

Registry last update: Sep 5, 2024 · Retrieved Nov 24, 2026

Estimated completion dates are not confirmed results disclosure dates.