NCT07056699

SGLT2i, Pioglitazone, and Ketone Production in T1D

The University of Texas Health Science Center at San Antonio · Phase 3 · RECRUITING

Enrollment
24
Study start
Jul 1, 2026
Primary completion
Jun 1, 2027
ESTIMATED

Registered primary endpoints

Change in endogenous glucose production (EGP)

Infusions of a tracer, ³H-glucose, will begin and continue until the end of the study. A single dose of empagliflozin (25 mg) by mouth will be taken at 900am. Blood samples will be collected minutes to assess how your body responds to the infused tracers. This tracer help to measure the rate of endogenous (liver) glucose production. The difference in levels of EGP will be reported from the beginning of the study to a second level taken 16 weeks later.

Time frame: Baseline (Week 0) to Week 16

Change in ketone body production ( ketogenesis)

Infusions of tracers, ³H-glucose and U-2H-glycerol or 14C-Glycerol, will begin and continue until the end of the study. A single dose of empagliflozin (25 mg) by mouth will be taken at 900am. Blood samples will be collected to assess how your body responds to the infused tracers. This tracer help to measure the rate of ketone body production (ketogenesis). The difference in levels of ketones will be reported from the beginning of the study to a second level taken 16 weeks later.

Time frame: Baseline (Week 0) to Week 16

Change in lipolysis (fat breakdown)

Infusions of tracers, U-H-14C-Glycerol or 2H-Glycerol, will begin and continue until the end of the study. A single dose of empagliflozin (25 mg) by mouth will be taken at 900am. Blood samples will be collected to assess how your body responds to the infused tracers. This tracer help to measure the rate of lipolysis (fat breakdown). The difference in levels of lipolysis will be reported from the beginning of the study to a second level taken 16 weeks later.

Time frame: Baseline (Week 0) to Week 16

Linked assets

Original registry record

ClinicalTrials.gov · NCT07056699

Registry last update: Jul 20, 2026 · Retrieved Nov 23, 2026

Estimated completion dates are not confirmed results disclosure dates.