NCT07059845

A Study to Assess Adverse Events and Change in Disease Activity of Multiple Treatment Combinations With Intravenous Mirvetuximab Soravtansine in Adult Participants With Ovarian Cancer

AbbVie · Phase 2 · RECRUITING

Enrollment
400
Study start
Nov 13, 2025
Primary completion
Jan 2029
ESTIMATED

Registered primary endpoints

Substudy 1, 2, and 3: Number of Participants with Treatment-Emergent Adverse Events (TEAEs) (any grade, Grade >= 3)

TEAEs defined as any adverse event (AE) with the onset after the first dose of study drug until 30 days after the last dose of the study drug.

Time frame: Up to Approximately 40 Months

Substudy 1, 2, and 3: Number of Participants with TEAEs Leading to Discontinuation

TEAEs defined as any adverse event (AE) with the onset after the first dose of study drug until 30 days after the last dose of the study drug.

Time frame: Up to Approximately 40 Months

Substudy 1, 2, and 3: Number of Participants with Ocular Adverse Events (AEs) (any grade, Grade >= 2)

An AE is defined as any untoward medical occurrence in a participant or clinical investigation participant administered a pharmaceutical product and which does not necessarily have a causal relationship with this treatment.

Time frame: Up to Approximately 40 Months

Substudy 1, 2, and 3: Overall Response (OR) as Assessed by the Investigator per RECIST v1.1

OR is defined as achieving a best overall response of confirmed complete response (CR) or confirmed partial response (PR) based on Response Evaluation Criteria in Solid Tumors (RECIST) v1.1.

Time frame: Up to Approximately 40 Months

Substudy 1: Progression free survival (PFS) as Assessed by the Investigator per RECIST v1.1

PFS is defined as the time from the date of randomization to the first occurrence of radiographic progression based on RECIST version 1.1 or death from any cause, whichever occurs first.

Time frame: Up to Approximately 40 Months

Linked assets

Original registry record

ClinicalTrials.gov · NCT07059845

Registry last update: Oct 13, 2026 · Retrieved Nov 23, 2026

Estimated completion dates are not confirmed results disclosure dates.